Leaving The Mass Spectrometer Ready For Operation; Emergency Shutdown Of The Mass Spectrometer - Waters Xevo TQ MS Operator's, Overview And Maintenance Manual

Hide thumbs Also See for Xevo TQ MS:
Table of Contents

Advertisement

2 Preparing the Mass Spectrometer for Operation

Leaving the mass spectrometer ready for operation

Leave the mass spectrometer in Operate mode except in the following cases:
When performing routine maintenance
When changing the source
When leaving the mass spectrometer unused for a long period
In these instances, put the mass spectrometer in Standby mode, see the online
Help for details.

Emergency shutdown of the mass spectrometer

Warning:
procedure outlined below. The instrument's power switch does not
isolate it from the main power supply.
Caution:
page
49.
To shut down the mass spectrometer in an emergency:
1.
Operate the power button on the front of the mass spectrometer.
2.
Disconnect the power cable from the back of the mass spectrometer.
50
February 11, 2013, 71500130002 Rev. D
To avoid electric shock, isolate the instrument observing the
To avoid losing data, reboot the instrument as described on

Advertisement

Table of Contents
loading

Table of Contents