Waters Xevo TQ MS Operator's, Overview And Maintenance Manual page 161

Hide thumbs Also See for Xevo TQ MS:
Table of Contents

Advertisement

7.
Unscrew the PEEK union from the UNF coupling (this connection is
finger-tight).
8.
Remove the ferrule from the capillary.
9.
Remove the capillary from the UNF coupling.
Warning:
capillary and ferrule according to local environmental
regulations. They can be contaminated with biologically
hazardous, or corrosive materials.
10. Dispose of the capillary and ferrule in accordance with local
environmental regulations.
Replacing the APCI probe sample capillary
Ferrule
To avoid spreading contamination, dispose of the
February 11, 2013, 71500130002 Rev. D
161

Advertisement

Table of Contents
loading

Table of Contents