Leaving The Mass Spectrometer Ready For Operation - Waters Xevo TQ-S Operator's, Overview And Maintenance Manual

Ivd mass spectrometry system
Table of Contents

Advertisement

3.
Insert a short length (7.5 cm) of PEEK™ tubing, or similar object, into
the reset button aperture to operate the reset button.
4.
Remove the PEEK tubing from the reset button aperture.
5.
Close the mass spectrometer's door.
6.
Wait until the reboot sequence ends before starting the MassLynx
software.
An audible alert sounds when the reboot sequence completes.
Tip:

Leaving the mass spectrometer ready for operation

Leave the mass spectrometer in Operate mode except in the following cases:
When performing routine maintenance
When changing the source
When leaving the mass spectrometer unused for a long period
In these instances, put the mass spectrometer in Standby mode (see the online
Help for details).
2-10
Preparing the Mass Spectrometer for Operation
Reset button aperture

Advertisement

Table of Contents
loading

Table of Contents