Waters Xevo TQ MS Operator's, Overview And Maintenance Manual page 178

Hide thumbs Also See for Xevo TQ MS:
Table of Contents

Advertisement

4 Maintenance Procedures
Requirement:
groove as shown.
4.
Fit the following new seals to the probe adjuster assembly:
Probe seal
Nebulizer gas seal
5.
Refit the source enclosure to the instrument (see
enclosure to the instrument" on page
178
February 11, 2013, 71500130002 Rev. D
These seals have a special cross-section; fit them in the
Seal
Groove
"Fitting the source
89).

Advertisement

Table of Contents
loading

Table of Contents