2 Preparing the Mass Spectrometer for Operation
d.
Click Resolve
Result:
IntelliStart software displays "Ready" in the Instrument Console.
Tip:
mode, IntelliStart software displays corrective actions in the
Instrument Console.
UNIFI software:
a.
From the Xevo TQ MS console, in the Maintain pane, click Vacuum.
b.
On the status page, click Pump.
Tip:
starting, the roughing pump starts. The Instrument System pane
shows that the instrument is in Standby mode, and the Operate
LED remains off.
c.
Wait a minimum of 2 hours for the instrument to be fully pumped
down (evacuated).
Tip:
green when the instrument is fully pumped down (evacuated).
d.
Click Instrument Operate Mode
Result:
UNIFI software displays status "Running" in the Instrument
Summary pane.
Tip:
into Operate mode, UNIFI software displays corrective actions.
44
February 11, 2013, 71500130002 Rev. D
or Operate
When the mass spectrometer is in good operating condition,
If clicking Resolve fails to put the instrument into Operate
After a 20-second delay, during which the turbopump is
In the Instrument Summary pane, the Status indicator shows
When the mass spectrometer is in good operating condition,
If clicking Instrument Operate Mode fails to put the instrument
.
.

Advertisement

Table of Contents
loading

Table of Contents