The screw can only be adjusted slightly. Otherwise, the closer will fail to work due to oil
leakage.
4.
----End

4.6.4.2.5 Installing Post Side Panels and Removing the Auxiliary Bar

Procedure
Step 1 Snap side panels into the door posts, push them down to the buckles, and ensure that they fit
firmly into the bottom of the posts.
Figure 4-85 Pushing down side panels
Step 2 Remove the auxiliary bar from the bottom of the door frame.
----End
Issue Draft A (2015-06-29)
Move the door for five consecutive times to ensure that the door can properly move back
to the original position.
Considering that people usually close a door with a deceleration, it is recommended that the speed set in
the tuning screw for openness range b be faster than that set in the tuning screw for openness range a.