Huawei IDS2000 Installation Manual page 164

Intelligent micro-modular data center 2000 mm high cabinet in dual-row aisle containment
Hide thumbs Also See for IDS2000:
Table of Contents

Advertisement

IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)
Component
Battery
Battery tray
Circuit breaker
Battery cables
Figure 4-193 Conceptual diagram for connecting battery cables
Issue Draft A (2015-06-29)
Configuration
100 Ah battery with charge
voltage of 384 V
Battery tray for 4 batteries
Circuit breaker,
pyromagnetic breaker,
380/415 Vac, 160 A, 3P, 36
kA, 102 (W) x 76.2 (D) x
130 (H)
Battery accessory, SD-384
V 100 Ah/12 V-PX-25 (ET),
Cables for battery group
SHOTO 6-GFM-100
embedded in battery cabinet
of IDC (25 mm
special
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation
Qty.
One string with 32 batteries
8 PCS
1 PCS
One string; usually
consisting of intra-layer
short cables, intra-layer long
cables, inter-layer cables,
inter-cabinet cables, positive
2
), IDC
cables, negative cables, and
N cables
156