Huawei IDS2000 Installation Manual page 163

Intelligent micro-modular data center 2000 mm high cabinet in dual-row aisle containment
Hide thumbs Also See for IDS2000:
Table of Contents

Advertisement

IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)
Introduction to Battery Cabinets and Batteries
The micro-module data center supports multiple battery configurations.
picture when batteries are installed inside a battery cabinet.
The picture is for reference only, and cannot be used as a guide for connecting cables for
batteries with other configurations.
Figure 4-192 Battery cabinet with batteries installed
(1) Battery cabinet
Typical Battery Application Scenario
This section uses a typical battery application scenario as an example to describe the battery
cable connection. The configuration applies to the scenario where the actual total power is
greater than 32 kW but no greater than 52 kW, and the backup time is 15 minutes. The
following table describes battery cabinet configuration.
Table 4-9 Battery cabinet configuration
Component
Issue Draft A (2015-06-29)
(2) Circuit breaker (optional)
Configuration
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation
Figure 4-192
is a
(3) Battery
(4) Tray
Qty.
155

Advertisement

Table of Contents
loading

Table of Contents