Step 4 Commission the magnet.
If the magnet does not work properly after power-on, check the following items:
1.
2.
3.
If any of the preceding conditions occur, troubleshoot the magnetic lock as follows:
1.
2.
3.
4.
Issue Draft A (2015-06-29)
Figure 4-114 Installing a magnet
Check whether the magnet provides magnetic force by attaching magnetizable iron parts
to them.
Check whether the double-door magnetic lock is aligned with the magnet.
Check whether a gap exists between the double-door magnetic lock and the magnet.
Check the circuit and rectify any circuit fault.
Adjust the magnetic base and door panels to align the magnetic lock with the magnet.
If a gap exists between the double-door magnet lock and the magnet, rectify the fault by
following instructions in
If the magnet is not level, use a spacer shown in
levelness.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
4-115.
Figure 4-116
4 Hardware Installation
to adjust the magnet
101