Figure 4-184 Base grounding diagram
(1) Base ground points
Figure 4-185 Connecting the ground cable between the base and cabinet
Connecting Cabinet Ground Cables
Figure 4-186
follows:
Issue Draft A (2015-06-29)
Connect one end of the base ground cable to any of the base ground points shown by (1)
in
Figure
4-184, and connect the other end to the ground busbar of the equipment room.
Connect one end of the base ground cable to any of the base ground points shown by (1)
in
Figure
4-184, and connect the other end to the rear door bottom inside the cabinet, as
shown in
Figure
4-185. Then connect the module ground cables by referring to
Connecting Cabinet Ground
shows the cabinet ground points. Connect ground cables between cabinets as
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Cables.