IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)
Step 3 If a base needs to be installed, mark the anchoring holes and position the base according to
distances between cabinet anchoring points indicated in the following figure.
Figure 4-3 Distances between cabinet anchoring points (unit: mm)
(1) Cabinet door
----End
4.3 Installing Bases
4.3.1 Installation Flowchart
Figure 4-4
Figure 4-4 Installation flowchart
Issue Draft A (2015-06-29)
shows the installation flowchart.