IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)
If the inlet water contains large granules, install a water filtering device at the inlet port to
prevent pipe blockage.
Table 4-1
Table 4-1 Water Quality Requirements
Name
Hydrogen ion
Conductivity at 20ºC (σ
a: If σ
for the first time. If σ

4.4.2 Precautions for Routing and Securing Air Conditioner Pipes

Precautions for Installing Air Conditioner Pipes
Take the following precautions when routing and securing air conditioner pipes:
Securing and Supporting Air Conditioner Pipes
It air conditioner pipes are routed beneath an air conditioner, it is recommended that the pipes
be fixed on the floor or to the base. It air conditioner pipes are routed above an air conditioner,
it is recommended that the pipes be fixed to the cable rack. Pipes must be securely fixed. It is
recommended that they be fixed using M8 or larger bolts.
Prepare or purchase supports shown in
required.
Issue Draft A (2015-06-29)
describes the NetCol5000-A water quality requirements.
a
)
20
is less than 300 µs/cm, it takes a longer time for the humidifier to generate vapor
20
is greater than 1250 µs/cm, the humidifier service life is affected.
20
Only trained and qualified personnel are allowed to weld air conditioner pipes. Welding
protection is required to prevent damaging other devices.
PPR chilled water pipes are recommended for the main drainage pipes of air conditioners.
For a horizontal flow air conditioner, it is recommended that the total diameter of the
PPR chilled water pipe does not exceed 80 mm after it is wrapped with thermal
insulation foam.
PPR cold water pipes are recommended for the main water inlet pipes of air-cooled air
conditioners. It is recommended that the total diameter of the PPR chilled water pipe
does not exceed 40 mm after it is wrapped with thermal insulation foam.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Requirement
7–8.5
300–1250
Figure 4-16
for refrigerant and water pipes onsite as
4 Hardware Installation
Unit
pH
μs/cm
32