Figure 4-98 Installing a supporting plate
Step 5 Install a partition plate. Press both sides of the V-shaped partition plate with hands to decrease
the angle to a proper degree, and clamp the clasps at the bottom into the square holes nearly,
as shown in
the middle. In actual conditions, determine the square holes as required.)
Figure 4-99 Installing a partition plate
Step 6 Rotate the interconnecting wrench and clamp it into the clasps until the wrench is horizontal,
as shown in
Issue Draft A (2015-06-29)
Figure
4-99. (By default, clamp the clasps into the adjacent two square holes in
Figure
4-100. This operation interconnects the cable troughs.