Figure 4-33 Taking out PDU2000 industrial connectors
Step 2 Lay out the PDU2000 industrial connectors and cables on the cabinet top, and close and lock
the rodent-proof mesh, as shown in
Cut the rodent-proof mesh based on the cable thickness using diagonal pliers. If the opening is
too large, unwanted things may fall into the cabinet through the opening.
Figure 4-34 Laying out PDU2000 industrial connectors and cables
Repeat the preceding steps to take out and preinstall PDU2000 industrial connectors for all cabinets.
----End
Issue Draft A (2015-06-29)
Figure
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4-34.
4 Hardware Installation
48

Advertisement

Table of Contents
loading

Table of Contents