Installing A Lan Switch - Huawei IDS2000 Installation Manual

Intelligent micro-modular data center 2000 mm high cabinet in dual-row aisle containment
Hide thumbs Also See for IDS2000:
Table of Contents

Advertisement

IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)
Figure 4-141 Connecting power cables for the server
----End

4.11.3 Installing a LAN Switch

Procedure
Step 1 Determine the LAN switch mounting holes in the network cabling cabinet according to the
engineering drawing, and install floating nuts.
Step 2 Install the mounting ears delivered with the LAN switch and secure the LAN switch to the
rack rail in the front of the cabinet, as shown in
Issue Draft A (2015-06-29)
This section describes only the installation method. The actual product appearance prevails.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation
Figure
4-142.