Huawei IDS2000 Installation Manual page 172

Intelligent micro-modular data center 2000 mm high cabinet in dual-row aisle containment
Hide thumbs Also See for IDS2000:
Table of Contents

Advertisement

IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)
Figure 4-201 Connecting the power cable to the lighting control box
(1) Cable 04050188
(3) Cable 25030384
1.
2.
Step 2 Connect monitoring cables to the lighting control box, as described in
4-15.
Figure 4-202 Connecting a monitoring cable to a lighting control box
Table 4-15 Ports on the lighting control box
Port
24 V DC OUTPUT
C SW1–C SW2
C INFARA1–C
Issue Draft A (2015-06-29)
Connect one end of cable 04050188 to the power port on the lighting control box. Cut
off and strip the other end and connect it to cable 25030384 using terminal 14170203.
Connect the other end of cable 25030384 to the circuit breaker in the PDU8000.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(2) Terminal 14170203
(4) PDU8000 circuit breaker
Function
Connects to the cabinet lighting switch (positive pole: brown;
negative pole: blue).
Connects to the aisle lighting switch (pole L: brown; pole N:
blue).
Connects to the signal cable for the infrared sensor switch
4 Hardware Installation
Figure 4-202
and
Table
164