Huawei IDS2000 Installation Manual page 183

Intelligent micro-modular data center 2000 mm high cabinet in dual-row aisle containment
Hide thumbs Also See for IDS2000:
Table of Contents

Advertisement

IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)
Figure 4-210 NetCol5000-A020 communications port
(1) Teamwork communications port 1
Step 2 Open the NetCol5000-A020 electric control box and verify the DIP switch settings.
4-211
are set to ON, and other switch toggles are set to OFF.
Figure 4-211 Main control board of the NetCol5000-A020
(1) DIP switch S1 of the main control board
Step 3 Connect the other end of the network cable to the COM port on the ECC collector.
Issue Draft A (2015-06-29)
shows the positions of DIP switches. In the S1 DIP switch, switch toggles 3, 4, 6, and 8
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation
(2) Teamwork communications port 2
Figure
175