IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)
Procedure
Step 1 Hold the top of the end panels with both hands to keep it vertical. Press it from up to down
into the hooks at the end of the cable troughs until the top of the end panels aligns with the top
of the cable troughs.
Figure 4-104 Pressing the end panels into the hooks
----End
4.9 (Optional) Installing the Access Control System
Figure 4-105
chooses to install the system.
Issue Draft A (2015-06-29)
Figure 4-104
During the installation, the interconnecting wrench is vertical.
shows the position for installing the access control system if the customer
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
uses a hot aisle as an example.
4 Hardware Installation
95