Huawei IDS2000 Installation Manual page 98

Intelligent micro-modular data center 2000 mm high cabinet in dual-row aisle containment
Hide thumbs Also See for IDS2000:
Table of Contents

Advertisement

IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)
Figure 4-96 Rotating the vertical plate by 90 degrees
Step 3 Install the other vertical plate in the eighth square hole counting from the clamping position of
the first vertical plate in the same way. Tighten one M5x10 black tapping screw inside one of
the two vertical plates using a long-handled Phillips screwdriver, as shown in
Figure 4-97 Installing the other vertical plate
Step 4 Press a supporting plate along the two vertical plates down to the place between the four
clasps and the cable bridge, as shown in
securely clamped into the clasps.
When installing the supporting plate, do not remove the grommet strip on the U-shaped trough.
Issue Draft A (2015-06-29)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
4-98. Ensure that the supporting plate is
4 Hardware Installation
Figure
4-97.
90

Advertisement

Table of Contents
loading

Table of Contents