IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)

2.2 Unpacking and Acceptance

Context
Unpack and inspect all cabinets, mechanical parts, and components. Check that all the items
are intact and comply with the packing list on the presence of both the project supervisor and
customer.
Procedure
Step 1 Unpack the carton labeled "Contain Packing List" and take out the Packing List.
Step 2 Check all items against the Packing List.
Step 3 If shortage or miscarriage occurs, fill in the Cargo Shortage and Miscarriage Report.
Step 4 If cargo damage occurs, fill in the Cargo Replacement Application Form.
Step 5 Sign on the Packing List with the customer after verifying that all required items are
delivered.
Step 6 Store the items properly.
----End
Follow-up Procedure
Put the items to be installed immediately onto an ESD surface, such as a polyethylene (PE)
bag or an expandable polyethylene (EPE) foam. Pack the items not to be installed
immediately with their original packing materials. Put them in a dry and cool environment
without exposure to sunlight or electromagnetic radiation.

2.3 Installation Environment Requirements

Ensure that the installation environment meets the requirements before installation.
Table 2-1 Installation environment checklist
Check Item
Floor bearing
capacity
Issue Draft A (2015-06-29)
Place the cartons in order, with the marked sides facing the same direction.
Requirement
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Standard live load of the equipment room:
2
8–12 kN/m
(If the battery cabinet is
contained in the module, use the standard live
load of the equipment room as a reference.)
Suspended load of the equipment room: 1.2
2
kN/m
Standard live load of the UPS room: 8–10
2
kN/m
Standard live load of the battery room: 16
2 Installation Preparations
Check Result
□ Compliant □
Incompliant
9