Commissioning via the built-in BOP

Note
For a detailed description of parameter settings for the quick commissioning, refer to the
topic "Quick commissioning (Page 63)".
Hot surface
During operation and for a short time after the power supply of the converter is switched off,
the marked surfaces of the converter can reach a high temperature. Avoid coming into
direct contact with these surfaces.
5.1

The built-in Basic Operator Panel (BOP)

5.1.1

Introduction to the built-in BOP

SINAMICS V20 Converter
Operating Instructions, 10/2019, A5E34559884-012
WARNING
5
53