KYMCO DINK 200i Service Manual page 210

Table of Contents

Advertisement

12
. COOLING SYSTEM
INSTALLATION
With thread lock applied to the threaded
part, tighten the water temperature sensor.
Torque: 0.8 kgf-m (8 N-m, 5.8 lbf-ft)
Connect the sensor connectors.
After the water temperature sensor has been
installed, fill coolant and perform air
bleeding (refer to the "COOLANT
REPLACEMENT" section in this
chapter).
12-19
DINK 200i/125

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dink 125

Table of Contents