4.5 BOOM ASSEMBLY

Removal

NOTE: The 400S main boom assembly weighs approximately
1300 lbs. (600 kg). The 460SJ main boom assembly weighs
approximately 1700 lbs. (790 kg).
1. Remove the jib and platform assembly. Refer to
Section 4.2 - Platform and Section 4.6 - Jib (460SJ Only).
2. Using suitable lifting device, adequately support boom
assembly weight along entire length.
3. Attach an adequate supporting device to the main lift
cylinder and master cylinder to support its weight.
NOTE: The main lift cylinder weighs approximately 260 lbs.
(118 kg).
3
2
3121671
4. Remove bolt and keeper pin from main lift cylinder pin
NOTE: The master cylinder weighs approximately 66 lbs. (30 kg).
5. Remove bolt and keeper pin from master cylinder pin
6. Remove bolt and keeper pin from main boom pin #3.
7. Tag and disconnect hydraulic lines from telescope cylin-
8. Using all applicable safety precautions, carefully lift
MASTER CYLINDER
MAIN LIFT
CYLINDER
Figure 4-13. Main Boom Removal
SECTION 4 - BOOM & PLATFORM
#1. Using a suitable brass drift and hammer, remove the
cylinder pin #1 securing main lift cylinder to main boom.
#2. Using a suitable brass drift and hammer, remove the
cylinder pin #2 securing master cylinder to main boom.
Using a suitable brass drift and hammer, remove the pin
#3 securing main boom to turntable.
der. Use suitable container to retain any residual hydrau-
lic fluid. Cap or plug all openings of hydraulic lines and
ports.
boom assembly clear of turntable and lower to ground
or suitably supported work surface.