Carrier Disassembly - JLG 400S Service And Maintenance Manual

Table of Contents

Advertisement

Carrier Disassembly

Refer to Figure 3-42.
1. Drive the Planet Shaft (3E) out of the carrier pin holes;
forcing the Roll Pin (3G) to sheer off.
2. Hold on to the Planet Gear (3F) and push the Planet
Shaft (3E) out of the Carrier (3A). The Thrust Washers (3B)
will slide off the shaft as it is removed.
3121671
3. Slide the Planet Gear (3F), the two Thrust Washers (3B)
4. Using a hammer and punch, drive the pieces of the Roll
5. Remove both rows of Needle Bearings (3C) and the
6. Repeat Steps 1 through 5 for the remaining two Cluster
Figure 3-42. Carrier Disassembly
SECTION 3 - CHASSIS & TURNTABLE
out of the Carrier (3A).
Pin (3G) out of the Planet Shaft (3E) and Carrier (3A).
Spacer (3D) from the bore of the Planet Gear (3F).
Gears (3F).
3-49

Advertisement

Table of Contents
loading

This manual is also suitable for:

460sj

Table of Contents