Connector Assembly Figure 2 - JLG 400S Service And Maintenance Manual

Table of Contents

Advertisement

SECTION 7 - BASIC ELECTRICAL INFORMATION & SCHEMATICS
Figure 7-11. Connector Assembly Figure 2
3. After all required contacts have been inserted, the
4. Slide the wedge lock into the housing until it is flush
wedge lock must be closed to its locked position.
with the housing (See Figure 7-13.).
Release the locking latches by squeezing them inward
(See Figure 7-12.).
Figure 7-13. Connector Assembly Figure 4
Figure 7-12. Connector Assembly Figure 3
3121671
7-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

460sj

Table of Contents