Composite Bearing Installation - JLG 400S Service And Maintenance Manual

Table of Contents

Advertisement

SECTION 5 - BASIC HYDRAULICS INFORMATION & SCHEMATICS
NOTE: Install pin into the composite bearing dry. Lubrication is
not required with nickel plated pins and bearings.
Figure 5-72. Composite Bearing Installation
14. Inspect the oil ports for blockage or the presence of dirt
or other foreign material. Repair as necessary.
15.
Inspect piston rings for cracks or other damage. Replace
if necessary.
5-78
ASSEMBLY
NOTE: Prior to cylinder assembly, ensure that the proper cylinder
seal kit is used. See the respective JLG Parts Manual.
NOTE: Apply a light film of hydraulic oil to all components prior to
assembly.
1. A special tool is used to install a new rod seal into the
applicable cylinder head groove.
Figure 5-73. Rod Seal Installation
WHEN INSTALLING NEW SEALS, ENSURE SEALS ARE INSTALLED PROPERLY.
IMPROPER SEAL INSTALLATION COULD RESULT IN CYLINDER LEAKAGE AND
IMPROPER CYLINDER OPERATION.
ROD
SEAL
BEARING
O-RING
Figure 5-74. Cylinder Head Seal Installation
O-RING
WIPER SEAL
RETAINING
RING
BACKUP
RING
MAF00300
3121671

Advertisement

Table of Contents
loading

This manual is also suitable for:

460sj

Table of Contents