JLG 400S Service And Maintenance Manual page 298

Table of Contents

Advertisement

SECTION 4 - BOOM & PLATFORM
3. Install new 8-32 x 0.500 self threading screw on other
side. Torque to 18-20 in. lbs. (2-2.25 Nm).
NOTE: When tightening screws make sure screw head is seated
against link with no space in between link and underside of
screw head.
4-24
REPLACE FIXED END BRACKETS
REPOSITION CABLES/HOSES AND KEEP COVERED DURING GRINDING TO PRE-
VENT DAMAGE.
1. Remove rivets as shown in link removal instructions on
page 4-19.
3121671

Advertisement

Table of Contents
loading

This manual is also suitable for:

460sj

Table of Contents