Output Carrier Disassembly - JLG E600 Service And Maintenance Manual

Hide thumbs Also See for E600:
Table of Contents

Advertisement

SECTION 3 - CHASSIS & TURNTABLE

Output Carrier Disassembly

1. Using a 1/8" diameter punch, drive the Roll Pin (4G)
into the Planet Shaft (4E) until it bottoms against the
Carrier (3A).
2. Using a soft face hammer, tap the Planet Shaft (4E)
out of the Carrier (4A).
3-10
4E Planet Shaft
4A Output Carrier
4F Planet Gear
4B Thrust Washer
4G Roll Pin
4C Needle Bearing
4H Thrust Washer
4D Thrust Spacer
Figure 3-4. Output Carrier
– JLG Lift –
3. Using a 1/8" diameter punch, drive the Roll Pin (4G)
out of the Planet Shaft (4E). NOTE: The Roll Pins
(4G) should not be reused when reassembling the
unit.
4. Slide the Planet Gear Sub-assembly (4) out of the
Output Carrier (4A) being careful to not drop the
Needle Bearings (4C) in the process.
3121813

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

E600jM600M600jM600jpE600jp

Table of Contents