Satec Expertmeter EM720 Operation Manual page 132

Power quality and revenue meter
Hide thumbs Also See for Expertmeter EM720:
Table of Contents

Advertisement

Chapter 6 Device Control and Upgrading
132
5. Wait about 10 seconds until the meter completes
burning firmware into the flash and reboots before
any further manipulating with the meter.
NOTES
1. When the meter reboots, the Ethernet and GPRS
networks are both restart, so communications may
be temporarily lost. You may need to wait a short
duration before PAS restores a connection with your
meter.
2. If you are connected to the meter via a wireless
GPRS network, the meter will logout of the network
and logon again so the IP address you used for
connecting to the meter will no longer be supported.
You should check the meter for a new GPRS
network IP address either from the front display, or
via PAS using another communication port.
EM720 Power Quality and Revenue Meter
Upgrading Meter Firmware

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Expertmeter EM720 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Expertmeter em720t

Table of Contents