LPOD C-, X-, or Ku-Band Outdoor Amplifier / Block Up Converter
Appendix C
Step Task
7
Re-install the fan shroud onto the chassis – take care to keep the fan
power supply cables clear of the fan and heat sink surfaces. Then, re-
install all screws as described in Step 2 – make sure that you re-install
the four longer screws at their same locations.
Torque the screws to 8 ±1 inch lbs.
8
Reconnect the power source to the LPOD.
Figure C-8. LPOD PS 1.5 Shroud Screw Locations
C–7
MN-LPOD
Revision 14