Casing Assembly - CleaverBrooks CFC-500 Operation, Service And Parts Manual

Clearfire condensing boiler
Hide thumbs Also See for CFC-500:
Table of Contents

Advertisement

Section 2 — Installation
Figure 2-2
CFC
500/750
1000
SIZE
A
70.625"
82.875"
B
118.625"
130.875"
C
20.5"
33.5"
D
3.15"
1.97"
E
3.15"
1.97"
F
20.5"
33.5"
G
1477 lbs
1554 lbs
2-4

3. Casing assembly

To assemble the CFC casing, the following tools are required:
Flat head screwdriver
Phillips screwdriver
Cordless screwdriver
Utility knife
Crescent wrench
Machine head screw bit
Diagonal cutters
Fork lift or pallet jack
1. Remove all packing material and open all boxes shipped with the boiler.
2. Remove all casing panels from box and group like pieces together for easy
access.
3. Locate boiler legs and attaching nuts/bolts (Figure 2-2). Ensure all four
leg height adjusters are at the same level before installing legs.
4. Remove the wooden skid cross beam from the front of the boiler
5. Using an appropriate jack, lift up the front of the boiler.
Note: A crane or fork lift may also be used to lift the boiler. When using a
crane, observe the rigging arrangement shown in Figure 2-3. To install
the boiler legs, first lift boiler, then remove and discard the wooden
base. Install legs and position the boiler. Proceed with step 10 below.
1500
1800
2500
74.875"
82"
122.875"
130"
132"
32.625"
32.625
37.375"
2.76"
2.76
3.94"
2.76"
2.76
3.94"
32.625
32.625
37.375"
1940 lbs
2061 lbs
3600 lbs
Figure 2-3 CFC Standard Rigging Arrangement
84"
Socket wrench
10mm socket
13mm socket
19mm socket
6" socket extension
Zip-ties
Sheet metal screws
Part No. 750-263

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cfc-2500Cfc-750Cfc-1000Cfc-1500Cfc-1800

Table of Contents