6. Attach the boiler front legs.
7. Lift up the back of the boiler using the jack and remove the wooden skid
side beams.
8. Attach the rear boiler mounting legs.
9. Lifting eyes are provided for moving and positioning the boiler.
10.Before installing insulation, level the boiler using a level placed against
the side of the vessel.
11.Wrap insulation blanket around pressure vessel. Ensure all pre-cut holes
fit completely over boiler fittings (Figure 2-4) and blanket is snug to the
vessel.
12.Peel backing from any excess length of insulation. Tuck excess portion
under other end of blanket. Place backing over overlapping segments
(Figure 2-5) and proceed with step 13.
13.Use tension springs to hold edges of blanket together. Poke end of spring
through the fabric of the insulation blanket (Figure 2-6). Place one spring
at the top and one at the bottom of the blanket. Place the remaining two
springs equally spaced.
14.Fit one end of black plastic strap to the fastener (Figure 2-7). Wrap strap
around the boiler and connect other end to fastener. Repeat with second
strap. Tighten straps so blanket is snug, but do not overtighten. Do not
compress insulation. Position the straps at ¼ and ¾ height.
Part No. 750-263
Figure 2-5
Figure 2-6
Section 2 — Installation
Figure 2-4
2-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cfc-2500Cfc-750Cfc-1000Cfc-1500Cfc-1800

Table of Contents