Gas Header - CleaverBrooks CFC-500 Operation, Service And Parts Manual

Clearfire condensing boiler
Hide thumbs Also See for CFC-500:
Table of Contents

Advertisement

Section 2 — Installation
Table 2-6: Multiple Unit Manifold, CFC 500
CFC 500 Boilers
# of Units
1
Pipe Size to
1"
Boiler
Header Pipe
1-1/4"
size
Table 2-8: Multiple Unit Manifold, CFC 1000
CFC 1000 Boilers
# of Units
1
Pipe Size to
1-1/4"
Boiler
Header Pipe
1-1/4"
size
Table 2-10: Multiple Unit Manifold, CFC 1800
CFC 1800 Boilers
# of Units
1
Pipe Size to
2"
Boiler
Header Pipe
2"
size
2-20

6. Gas Header

Design of a single common gas header with individual takeoffs for a
multiple unit installation is recommended. Boiler gas manifold
piping should be sized based on the volume requirements and
lengths between boilers and the fuel main header (see Figure 2-23).
Tables 2-6 to 2-11 indicate the proper sizing for multiple units of
equal size, placed on the factory standard center with the noted
take off size. For installations with a mixed sized use, determine the
flow of each unit and total the input. With the total input, determine
length of run from the source and determine what size header will
be needed for the flow of all units firing. Pipe sizes based on Table
2-4.
2
3
4
1"
1"
1"
1-1/4"
1-1/2"
2"
2
3
4
1-1/4"
1-1/4"
1-1/4"
2"
2"
2-1/2"
2
3
4
2"
2"
2"
2-1/2"
3"
3"
Table 2-7: Multiple Unit Manifold, CFC 750
CFC 750 Boilers
# of Units
1
Pipe Size to
1"
Boiler
Header Pipe
1-1/4"
size
Table 2-9: Multiple Unit Manifold, CFC 1500
CFC 1500 Boilers
# of Units
1
Pipe Size to
1-1/2"
Boiler
Header Pipe
1-1/2"
size
Table 2-11: Multiple Unit Manifold, CFC 2500
CFC 2500 Boilers
# of Units
1
Pipe Size to
2"
Boiler
Header Pipe
2"
size
2
3
4
1"
1"
1"
1-1/2"
2"
2-1/2"
2
3
4
1-1/2"
1-1/2"
1-1/2"
2"
2-1/2"
3"
2
3
4
2"
2"
2"
3"
3"
4"
Part No. 750-263

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cfc-2500Cfc-750Cfc-1000Cfc-1500Cfc-1800

Table of Contents