Setting And Operation Of Jog Operation (Speed Changes) - Panasonic FP7 User Manual

Multi input/output unit
Hide thumbs Also See for FP7:
Table of Contents

Advertisement

10.8.2 Setting and Operation of JOG Operation (Speed Changes)

It is possible to change a target speed during the JOG operation. The target speed is changed
by rewriting unit memories using a user program.
 Operation diagram
f [Hz]
20,000Hz
10,000Hz
1,000Hz
100ms
Instruction start
condition
Busy signal
Operation done signal
JOG operation
20,000
target speed
 Operations of each contact
• The BUSY flags (X30-X33), which indicate that the motor is running, will turn on when the
JOG operation starts, and they will turn off when the operation completes.
• The operation done flags (X34-X37), which indicate the completion of operation, will turn on
when the current operation is completed, and they will be held until the next positioning
control, JOG operation or home return operation starts.
 Characteristics of acceleration/deceleration zone when changing speeds
• The speeds of acceleration zone and deceleration zone changes by approx. 100 us when
changing the speeds in the JOG operation. The speed variation is obtained by the following
formula.
Speed variation = (JOG operation target speed - Startup speed) / (JOG acceleration time or
JOG deceleration time)
• When the JOG acceleration time or JOG deceleration time is set to 0 ms, the speed will be
changed immediately.
 Settings
Item
Startup speed
JOG acceleration time
Axis setting area
JOG deceleration time
JOG operation target speed
Approx.100ms
Approx.100ms
10,000
Rewriting the target speed
t [ms]
Setting example
1,000 Hz
100 ms
200 ms
20,000 Hz → 10,000 Hz
10.8 JOG Operation
10-37

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents