Relocating/Storing The Server - NEC Express5800 110Ej User Manual

Table of Contents

Advertisement

RELOCATING/STORING THE SERVER

Follow the procedure below to relocate or store the server:
Observe the following instructions to use the server safely. Failure to follow
these instructions may cause a fire, personal injury, or property damage. See
pages 1-3 to 1-8 for details.
IMPORTANT:
If the server needs to be relocated/stored due to a change in the floor layout to a great
extent, contact your service representative.
Make sure to make a backup copy of your valuable data in the hard disk drive, if any.
Make sure not to apply a shock to hard disk drives to relocated the server if the contains
any.
1.
Take a floppy disk and a CD-ROM out of the server, if any.
2.
Power off the server (the POWER/SLEEP lamp goes off).
3.
Unplug the power cord of the server from a power outlet.
4.
Remove all the cables from the server.
5.
Hold the server by its bottom to carry the server.
IMPORTANT:
disengaged from the server, causing personal injury.
6.
Protect the server with the shock-absorbing materials, and pack it securely.
CAUTION
Never attempt to lift the server only by yourself.
Do not install the server in any place other than specified.
Do not connect/disconnect any interface cable with the power cord of the
server plugged to a power source.
Do not hold the front mask to lift the server. The front mask may be
Maintenance 7-11

Advertisement

Table of Contents
loading

Table of Contents