Edge-Core ECS4110-28T Management Manual page 151

28/52-port gigabit ethernet layer 2+ switch
Hide thumbs Also See for ECS4110-28T:
Table of Contents

Advertisement

At – Specifies a time at which to reload the switch.
DD - The day of the month at which to reload. (Range: 01-31)
MM - The month at which to reload. (Range: 01-12)
YYYY - The year at which to reload. (Range: 1970-2037)
HH - The hour at which to reload. (Range: 00-23)
MM - The minute at which to reload. (Range: 00-59)
Regularly – Specifies a periodic interval at which to reload the
switch.
Time
HH - The hour at which to reload. (Range: 00-23)
MM - The minute at which to reload. (Range: 00-59)
Period
Daily - Every day.
Weekly - Day of the week at which to reload.
(Range: Sunday ... Saturday)
Monthly - Day of the month at which to reload. (Range: 1-31)
W
I
EB
NTERFACE
To restart the switch:
Click System, then Reset.
1.
Select the required reset mode.
2.
For any option other than to reset immediately, fill in the required
3.
parameters
Click Apply.
4.
When prompted, confirm that you want reset the switch.
5.
– 151 –
| Basic Management Tasks
C
4
HAPTER
Resetting the System

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecs4110-28pEcs4110-52tEcs4110-52p

Table of Contents