Labeling Jacks - Avaya PARTNER ACS Installation And Use Manual

Advanced communications system
Hide thumbs Also See for PARTNER ACS:
Table of Contents

Advertisement

4. In the other slots, from left to right, first install
the 1600 DSL module, then the 012E, 308EC,
or 206 modules, followed by the 400 or 200
modules and/or a PARTNER Messaging or
PARTNER MAIL VS module. Align the module
carefully in the appropriate slot. For proper
engagement of the connectors, the module
must be inserted straight into the carrier (see
Figure
2-10). Once the module is properly
seated, firmly push the center of the module
until the connectors on the module lock into
place. A slight click indicates the connectors are
engaged.
If you use a 1600 DSL module, it must be in the first slot on the left. The 012E, 308EC, and
206 modules must be to the left of any 400 and 200 module.
PARTNER ACS Release 5.0 supports Endeavor telephones when an Endeavor 362EC
module is installed in the carrier. Install the Endeavor 362EC module(s) to the right of the
1600 DSL module, if one is installed, and to the left of all 400 and 200 modules.
In Release 5.0, the system extension maximum is 48. However, in some configurations,
the 012E module and/or the PARTNER Messaging module will physically permit more
than 48 stations to be installed in the 5-slot carrier. In these configurations, only station
ports and voice messaging ports up to 48 will function. Station ports and voice messaging
ports above 48 will not function with ETR or T/R telephones because they are outside the
PARTNER ACS dial plan.
CAUTION:
Do not force the module. Use the carrier shelf as a reference and do not tilt, slant, or
rotate the module. If the module does not insert easily, remove it, clear any
obstruction, and reinsert it.

Labeling Jacks

After you have mounted the control unit on the wall, you must label the line and extension jacks.
The line jacks are on the top of the modules, and the extension jacks on the bottom
(see
Figure
2-11).
Carrier Shelf
YES
Figure 2-10. Inserting a Module
Installing the Control Unit
Installation
Carrier Shelf
NO
2-9

Advertisement

Table of Contents
loading

Table of Contents