Digital controller
Hide thumbs Also See for E5AR - MANUAL 2:
Table of Contents

Advertisement

● Limitations during
SP ramp

■ Banks

● Local SP
Local SP
1
0.lsp
0.0
l.bnk
• AT starts at the SP during ramp.
• The ramp SP at AT startup is held during AT.
• SP ramp is disabled when operation is stopped.
• The SP ramp control begins with SP start after recovery from a
sensor error. (Control begins about 1 second after recovery from a
sensor error.)
• When a sensor error occurs, the goal SP takes effect and the alarm
function operates with respect to the goal SP.
Setting data
SP ramp SP value
monitor
SP ramp rise value
SP ramp fall value
SP ramp time unit
*1 EU/sec, EU/min, or EU/hour depending on the "SP ramp time unit"
setting
*2 The decimal point position depends on the input type.
• Up to eight banks can be created. Each bank is used to store an SP
(local SP), alarm value, and a PID Set No..
Bank No.
Local SP
PID Set No.
Alarm value 1 to 4
Alarm value upper limit 1 to 4
Alarm value lower limit 1 to 4
• The "Local SP" is the SP that is used during operation. The SP
value that appears and can be set in the PV/SP setting screen in
"RUN level" is the local SP value of the currently executing bank
number.
• The bank number appears as the leading digit of the setting data.
5.2 Control functions
Monitor and setting
Units
range
0 to 99999 *2
0 to 99999 *2
S: EU/sec,
M: EU/min,
H: EU/hour
0
1
200.0
500.0
0
0
240
300
40
30
40
30
Default
value
EU
-
*1
0
*1
0
-
1
(EU/min)
7
• • •
5-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

E5er

Table of Contents