Verify Opti-6100 Chassis Wiring To The Dsx-3; Prerequisite Procedures; Tools And Materials Required; Procedure - ADTRAN OPTI-6100 Installation Manual

Installation and turn-up practice
Hide thumbs Also See for OPTI-6100:
Table of Contents

Advertisement

Verify OPTI-6100 Chassis Wiring to the DSX-3

This procedure details the test steps which must be performed to verify that an OPTI-6100
chassis has been properly wired to the DSX-3. This procedure should be performed by two
people: one at the chassis under test and the other at the MDF.

Prerequisite Procedures

The following procedure must be completed prior to verifying the OPTI-6100 chassis wiring to
the DSX-3. If necessary, refer to the appropriate documentation before proceeding. The prereq-
uisite procedure is as follows:
OPTI-6100 Installation and Turn-Up Practice (P/N 61184500L1-5)

Tools and Materials Required

PC connected to the craft port or through Telnet

Procedure

1. Power on the DS3 test set and configure for a 215-1 test pattern.
2. Connect a DS3 cable from the TX output of the test set to the RX input of the MDF facility
to be tested.
3. Connect a DS3 cable from the RX input of the test set to the TX output of the MDF facility
to be tested.
4. Connect a serial cable to the CRAFT port of the OPTI-6100.
5. Open a terminal session and configure the baud rate to 19200.
6. Log in to the OPTI-6100 with a username and password. The default username is ADMIN.
The default password is PASSWORD.
7. After logging in, select the HS1 on the Main menu, and press
8. From the HS1 menu, select
9. From the Provisioning menu, select
10. From the Service States menu, select
11. From the Equipment Menu, select
12. From the Service States menu, select
13. From the Facility menu, select
14. Press
to return to the
E
SC
15. From the Provisioning menu, select
16. From the STS1 Mapping menu, select the HS1 STS-1 to be mapped, and press
If there is no mapping, select HS1 STS-1 #1. Do not use menu options #4-15. Only use HS1
with the default payload type for this test.
17. From the Select Drop menu, select the tributary module to be mapped, and press
18. From the Select Port menu, select
61184500L1-5L
Appendix A, Acceptance Test Procedure - Follow-Up Procedures
, and press
Provisioning
Service States
Equipment Provisioned State
IS (In Service)
Facility Provisioned State
, and press
IS (In Service)
menu.
Provisioning
STS-1 Mapping
, and press
Port #1
E
NTER
.
E
NTER
, and press
.
E
NTER
, and press
, and press
.
E
NTER
, and press
.
E
NTER
, and press
.
E
NTER
.
E
NTER
.
.
E
NTER
.
E
NTER
.
E
NTER
E
NTER
.
A-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents