Tram3 Provisioning - ADTRAN OPTI-6100 Installation Manual

Installation and turn-up practice
Hide thumbs Also See for OPTI-6100:
Table of Contents

Advertisement

OPTI-6100 Installation and Turn-Up Practice

TRAM3 Provisioning

Use this Provisioning procedure to provision the TRAM3 module (P/N 1184532L1).
To provision the TRAM3 module, complete the following steps:
1. From the OPTI-6100 Main menu, select
2. From the MS Modules menu, select the TRAM3 module to provision, and press
3. From the TRAM3 menu, select
4. From the Provisioning menu, select
5. From the Equipment Provisioned State menu, select
6. From the Provisioning menu, select
7. From the Facility Provisioned State menu, select
8. Repeat
step 6
and
9. From the Provisioning menu, select
NOTE
AINS prevents alarms from being reported on facilities that are not
yet receiving a valid signal. Refer to
10. From the AINS Timer menu, select
11. From the Provisioning menu, select
12. On the AINS Time screen, enter the number of hours and minutes, and press
13. From the Provisioning menu, select
14. From the Line Build Out menu, select
322
Provisioning
Equipment Provisioned State
Facility # Provisioned State
step 7
for each of the remaining facilities.
AINS Timer
Enable
AINS Time
Line Build Out
, and press
MS Modules
, and press
.
E
NTER
and press
IS,
and press
IS,
, and press
E
"Auto In-Service"
, and press
.
E
NTER
, and press
E
NTER
, and press
or
, and press
Short
Long
.
E
NTER
, and press
.
E
NTER
.
E
NTER
, and press
.
E
NTER
to place the facility IS.
E
NTER
.
NTER
on page 332.
.
E
.
E
NTER
.
E
NTER
61184500L1-5L
.
E
NTER
.
NTER

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents