Omm3 Module Provisioning - ADTRAN OPTI-6100 Installation Manual

Installation and turn-up practice
Hide thumbs Also See for OPTI-6100:
Table of Contents

Advertisement

OMM3 Module Provisioning

All OMM3 modules must be provisioned to be put into service. In particular, equipment and
facilities must be put into service, and STS circuits assigned to the equipped mid-speed groups.
To provision an OMM3 module, complete the following steps:
1. From the OPTI-6100 Main menu select
NOTE
These instructions are for the module in slot HS1. With the exception
of the STS Mapping, these settings must be repeated on HS2.
2. From the ADTRAN OMM-3 menu, select
3. From the Provisioning menu, select
4. From the Service States menu, select
5. From the Equipment menu, select
6. From the Service States menu, select
7. From the Facility menu, select
8. From the Service States menu, select
NOTE
AINS prevents alarms from being reported on facilities that are not
yet receiving a valid signal. Refer to
9. From the AINS Timer menu, select
10. From the Service States menu, select
11. On the AINS Time screen, enter the number of minutes (1–5760), and press
NOTE
Placing a facility IS automatically places its paths IS. To change the
service state of a path, complete the following three steps:
12. From the Service States menu, select
13. From the STS-1 Path Provisioning menu, select an STS-1 path, and press
14. From the Path [n] menu, select IS, and press
15. If provisioning at the VT level, select
16. From the VT Service States menu, select the VT to place In Service, and press
17. From the VT [n] menu, select
18. Press
the appropriate number of times to return to the Provisioning menu.
E
SC
19. From the Provisioning menu, select
61184500L1-5L
HS1 - [module type]
Provisioning
, and press
Service States
, and press
Equipment
, and press
IS
E
, and press
Facility
, and press
IS
E
NTER
, and press
AINS Timer
"Auto In-Service"
, and press
Enable
, and press
AINS Time
STS-1 Path Service States
E
NTER
VT Service States
, and press
to place the VT In Service.
IS
E
NTER
, and press
Mapping
OMM Module Installation and Turn-Up
, and press
E
NTER
, and press
.
E
NTER
.
E
NTER
.
E
NTER
to place the module In Service.
NTER
.
E
NTER
to place the facility In Service.
.
E
NTER
on page 332.
.
E
NTER
.
E
NTER
, and press
to place the STS-1 path In Service.
, and press
.
E
NTER
.
E
NTER
.
.
E
NTER
.
E
NTER
.
E
NTER
.
E
NTER
227

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents