GESM or GEMM Provisioning
Use this Provisioning procedure to provision the following modules:
GESM (P/N 1184518L1)
♦
GEMM (P/N 1184519L1)
♦
To provision a GESM or GEMM module, complete the following steps:
1. From the OPTI-6100 Main menu, select
2. From the MS Modules menu, select the module to provision, and press
3. From the module menu, select
4. From the Provisioning menu, select
5. From the Equipment Provisioned State menu, select
6. From the Provisioning menu, select
7. From the Facility Provisioned State menu, select
8. From the Provisioning menu, select
NOTE
AINS prevents alarms from being reported on facilities that are not
yet receiving a valid signal. Refer to
9. From the AINS Timer menu, select
10. From the Provisioning menu, select
11. On the AINS Time screen, enter the number of hours and minutes, and press
Table 155
lists the minimum factory defaults and values that are loaded after installation and
self-test for the GESM module.
Provisioning Options
Equipment Provisioned State
Facility Provisioned State
AINS Time
AINS Timer
Protocol
Refer to
"Appendix C, Advanced Ethernet Provisioning"
provisioning options.
61184500L1-5L
Provisioning
Equipment Provisioned State
Facility Provisioned State
AINS Timer
Enable
AINS Time
Table 155. GESM/GEMM Provisioning Options
Settings
1 Minute to 96 Hours; 4:00 is the default
, and press
MS Modules
, and press
E
NTER
and press
IS,
, and press
and press
IS,
, and press
"Auto In-Service"
, and press
E
NTER
, and press
E
IS
♦
♦
OOS-MA
♦
IS
OOS-MA
♦
Enabled
♦
GFP (default)
♦
♦
PPP
for more details on various Ethernet
Tributary Module Installation and Turn-Up
.
E
NTER
.
E
NTER
.
, and press
.
E
NTER
.
E
NTER
.
E
NTER
to place the facility IS.
E
NTER
.
E
NTER
on page 332.
.
.
NTER
OOS-MA UAS (default)
♦
♦
OOS-MA UAS (default)
Disabled (default)
♦
X.86
♦
.
E
NTER
311