Installing a Rack
007-4566-001
Warning:
Employ a minimum of two people to lift the system module or
modules off the shipping pallet, to move the module(s) from one location to
another, and to install the module(s) in a rack. Otherwise, someone could be
seriously injured.
•
Do not move the system while it is connected to power.
Danger:
Keep fingers and conductive tools away from high-voltage areas. Failure to
follow these precautions will result in serious injury or death. The high-voltage areas
of the system are indicated with high-voltage warning labels.
•
Ensure that a qualified electrician has properly installed the power receptacles.
•
Set all circuit breakers to the OFF (
cord.
Warning:
Use the following guidelines to prevent the rack from toppling over.
Otherwise, people could be seriously injured and/or equipment could be damaged.
•
Follow these guidelines to prevent the rack from toppling over:
•
Make sure that only one module is extended out of the rack at one time.
•
Install all equipment in the lowest available position in the rack.
•
Ensure that the tip tray is bolted to the front of the rack.
This section describes how to install a rack at your site location, as follows:
•
"Preinstallation Activities" on page 6
•
"Unloading and Moving System Equipment" on page 10
•
"Removing a Short Rack from the Shipping Crate" on page 13
•
"Removing a Tall Rack from the Shipping Crate" on page 16
•
"Positioning and Leveling a Single-rack System" on page 19
) position before you plug in the system power