1: Installation and Operation
Preinstallation Activities
Site Plan Verification
6
•
"Positioning and Leveling a Multiple-rack (Clustered) System" on page 20
Although these instructions are based on the assumption that you have ordered an
empty rack or racks to rackmount your own modules, you can also use these instructions
to install a rack that already has your server system modules rackmounted and cabled
together. If this is the case, after you have completed installing your rack, proceed to
"Cabling the Server System to a Power Source" on page 48 to continue your installation.
If your system will not be rackmounted, skip this section and proceed to "Unpacking and
Inspecting Server System Modules" on page 23 to begin your installation.
Perform the following preinstallation activities days or weeks before you receive your
system: perform site verifications, gather appropriate tools to complete the installation,
and ensure that the correct power receptacle is installed and properly wired. These
activities are explained in the following subsections:
•
"Site Plan Verification" on page 6
•
"Tools Required" on page 7
•
"Power Receptacle Verification" on page 7
Ensure that all site requirements are met before your system arrives. If you have
questions about the site requirements or you would like to order full-size floor templates
for your site, contact a site planning representative by e-mail (site@sgi.com) or by
telephone (+1 715 726 2820).
007-4566-001
Need help?
Do you have a question about the Origin 350 and is the answer not in the manual?
Questions and answers