1: Installation and Operation
Inspecting the Shipping Crate
12
Figure 1-4 shows the lift openings and dimensions of a short rack shipping crate. This
figure also shows where to position the pallet jack.
Side view
48.75
(1238 mm)
42.75
(1068 mm)
Pallet jack position
Figure 1-4
Dimensions of Short Rack Shipping Crate
After the system is unloaded from the truck, follow these steps before you unpack it:
1. Ensure that the crates and cartons arrive unopened.
2. Inspect the shipping crate for signs of external damage such as dents, holes, crushed
corners, and water marks.
3. Ensure that the tilt watch has not been tripped.
4. If the crate is damaged, file a damage claim with the carrier immediately. In
addition, notify your local Customer Support Center (CSC) for any missing,
incorrect, or damaged items. For CSC contact information, see
http://www.sgi.com/support/supportcenters.html.
End view
29.25
(743 mm)
007-4566-001