Front . .
MANUAL TRANSMISSION -
Component Parts (Output Shaft Assembly)
MT-25
No.2
No.1
WM0265
C5900
WMOl14
WMOl15
(e)
Using a dial indicator, check the shaft runout.
Maximum runout:
0.06 mm (0.0024 in.)
ASSEMBLY OF OUTPUT SHAFT ASSEMBLY
1.
INSERT NO.1 AND NO.2 CLUTCH HUB INTO HUB SLEEVE
(a)
Install the clutch hub and shifting keys to the hub
sleeve.
(b)
Install the shifting key springs under the shifting keys.
NOTICE:
Install the key springs positioned so that their
end gaps are not in line.
2.
INSTALL THIRD GEAR AND NO.2 CLUTCH HUB ON OUT-
PUT SHAFT
(a)
Apply gear oil to the shaft.
(b)
Place the synchronizer ring on the gear and align the
ring slots with the shifting keys.
(c)
Using a press, install the 3rd gear and No.2 clutch hub.