Work the corners of the panel down over the roll bar mounts and seat harness tabs a little at a time on
each side.
Once the panel lies flat, finish rivet it into place. The rivets along the front 2"x 3" tube should be close
to the back as possible for drill and rivet gun access.
Battery Mounting and Cable
Drill, 1" hole saw,
3
/
" hex key.
16
Secondary Body fasteners, Battery mounting kit, Insulated clip hardware, misc. electrical
components, battery, Mustang Ground cable.
3
/
", ¼",
5/
" drill bits, rivet gun, marker,
16
16
www.factoryfive.com
7
/
" deep socket, ratchet, ½" wrench,
16
225
508-291-3443