3-74
ENGINE
MOVABLE DRIVE FACE ASSEMBLY
• Check that no roller inside the movable drive face is out of
position from the slot.
• Install the movable drive face assembly 1.
$
* The assembly work should be carefully performed so
as not to allow the roller to dislocate.
* Degrease the drive belt contact surface (pulley face).
• Install the fixed drive face 2.
• Install the washer 3 and fixed drive face nut 4.
$
Check that the fixed drive face is not fouled with
grease or other substance and if found, clean and
degrease completely.
Check that the parts are properly engaged with the
spline.
• With the crankshaft locked, tighten the fixed drive face nut 4
to the specified torque.
# Fixed drive face nut: 105 N·m (10.5 kgf-m, 76.0 lb-ft)
• To obtain proper contact of the drive V-belt 5, turn the fixed
drive face 6 until the fixed drive face and the movable driven
face 7 can rotate synchronously.
CLUTCH INNER COVER
• Install the dowel pins 1, 2.