Installtation - Suzuki AN400 Service Manual

Hide thumbs Also See for AN400:
Table of Contents

Advertisement

• Continue to heat water until 95 °C (203 °F) is exceeded and
check for the thermostat valve lift when temperature is at 95
°C (203 °F).
• If the valve lift is out of specification or less then the specifica-
tion, replace the thermostat with a new one.
$ Thermostat valve lift: 3.0 mm (0.12 in)

INSTALLTATION

• Position the thermostat with the air bleeder hole A upside.
• Install the thermostat case 1.
% Thermostat case bolt: 10 N·m (1.0 kgf-m 7.0 lb-ft)
NOTE:
Tighten the bolt together with the clamp 2 and secure the
high-tension cord with the clamp.
• After the thermostat has been installed, fill coolant and per-
form air bleeding. ("2-15)
COOLING AND LUBRICATION SYSTEM
Lift
6-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

An400 2003

Table of Contents