• Remove the PAIR hose 1.
• Remove the intake pipe bolts and then remove the intake pipe
2 along with the throttle body 3.
• Remove the O-rings 4 and insulator 5.
• Disconnect the starter motor lead wire 6 and engine ground
lead wire 7.
• Disconnect the generator coupler 8 and CKP sensor coupler
9.
• Disconnect the clamps 0, A.
ENGINE
3-5