Suzuki AN400 Service Manual page 51

Hide thumbs Also See for AN400:
Table of Contents

Advertisement

• Remove the PAIR hose 1.
• Remove the intake pipe bolts and then remove the intake pipe
2 along with the throttle body 3.
• Remove the O-rings 4 and insulator 5.
• Disconnect the starter motor lead wire 6 and engine ground
lead wire 7.
• Disconnect the generator coupler 8 and CKP sensor coupler
9.
• Disconnect the clamps 0, A.
ENGINE
3-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

An400 2003

Table of Contents